Sku: PT4113
Brand: Jackson Power
Category: Power Boards
Availability: In Stock
Ships in 1-2 days.
Pickup from Seven Hills in 1-2 days.
Shipping Calculator
Find
Length: 3M, Outlet: 4, Plug: R/Angle, Colour: White, Warranty: 01 Year, PT4113.
We Accept
Manufacture # Jackson | Model # PT4113
These high-quality budget priced powerboards offer customers a high rated level of surge and overload protection. Features handy right-angle plug, 3-meter power cord, and strip design to fit neatly behind furniture and office equipment.
Features:
Overview:
Manufacturer Warranty: 01 Year Limited Warranty
| Brand | JACKSON |
| Length | 3M |
| Outlet | 4 |
| Plug | R/Angle |
| Colour | White |
| Switch | Yes |
Add Your Review
Have a question about Jackson 4 way Power Board With Surge Protection & 3m Long-lead (PT4113)? Fill in the form below and our team will get back to you.